To: Board of Supervisors
From: Brian M. Balbas, Public Works Director
Report Title: Approve and Authorize to fully close a portion of Alpine Road, on October 11, 2023, from 8:30 a.m. through 4:00 p.m., San Pablo area.

RECOMMENDATIONS:
ADOPT Resolution approving and authorizing the Public Works Director, or designee, to fully close a portion of Alpine Road, on October 11, 2023, from 8:30 am through 4:00 pm, for the purpose of a utility pole replacement, San Pablo area. (District I)
FISCAL IMPACT:
No fiscal impact.
BACKGROUND:
Pacific Gas & Electric Company shall follow guidelines set forth by the Public Works Department. Pacific Gas & Electric Company is requesting a road closure for a utility pole replacement. The closure is necessary to maintain traffic safety due to the narrow roads.
CONSEQUENCE OF NEGATIVE ACTION:
Applicant will be unable to close the road for planned activities.
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. |
ATTESTED: |
|
|
Monica Nino, County Administrator and Clerk of the Board of Supervisors |
|
|
By: |
cc: Larry Gossett- Engineering Services, Kellen O’Connor - Engineering Services, Bob Hendry, Engineering Services, Marke Smith -Engineering Services, Chris Lau, Maintenance, CHP, Sheriff- Patrol Division Commander
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
and for Special Districts, Agencies and Authorities Governed by the Board
body
IN THE MATTER OF: Approving and Authorizing the Public Works Director, or designee, to fully close a portion of Alpine Road, on October 11, 2023, from 8:30 a.m. through 4:00 p.m., for the purpose of a utility pole replacement, San Pablo area. (District I)
RC23-20
NOW, THEREFORE, BE IT RESOLVED that permission is granted to Pacific Gas & Electric Company to fully close a portion of Alpine Road, except for emergency traffic, local residents, US Postal Service, and garbage trucks, on October 11, 2023, for the period of 8:30 a.m. through 4:00 p.m., subject to the following conditions:
1. Traffic will be detoured via neighboring street(s) per the traffic control plan reviewed by Public Works. Emergency vehicles, residents within the event area, and essential services will be allowed access as required.
2. All signings are to be in accordance with the California Manual on Uniform Traffic Control Devices.
3. Pacific Gas & Electric Company shall comply with the requirements of the Ordinance Code of Contra Costa County.
4. Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance.
5. Obtain approval for the closure from the Sheriff’s Department, the California Highway Patrol, and the Fire District.
|
I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown. |
ATTESTED: |
|
|
Monica Nino, County Administrator and Clerk of the Board of Supervisors |
|
|
By: |