To: Board of Supervisors
From: Warren Lai, Public Works Director/Chief Engineer
Report Title: Ratifying the prior decision of the Public Works Director, or designee, to fully close a portion of Rollingwood Drive, portions of Greenwood Drive, Clarendon Court, and Carlton Court, on July 29, 2024, through September 1, 2024, from 7:00 a.m. through 5:00 p.m., for the purpose of installing and replacing gas services, San Pablo area.
☒Recommendation of the County Administrator ☐ Recommendation of Board Committee

RECOMMENDATIONS:
ADOPT Resolution ratifying the prior decision of the Public Works Director, or designee, to fully close a portion of Rollingwood Drive, from Greenwood Drive to Fordham Street, Greenwood Drive from Bancroft Lane to Clarendon Court, all of Greenwood Drive, from Rollingwood Drive to Bowhill Lane, Clarendon Court, and Carlton Court, on July 29, 2024, through September 1, 2024, from 7:00 a.m. through 5:00 p.m., for the purpose of installing and replacing gas services, San Pablo area. (District I)
FISCAL IMPACT:
No fiscal impact.
BACKGROUND:
PG&E is requesting a road closure to facilitate the installation of new gas mains. Additionally, PG&E will be conducting multiple service transfers and replacements. Pacific Gas & Electric Company (PG&E) shall follow guidelines set forth by the Public Works Department.
This request was previously approved by the Board of Supervisors on May 14, 2024, and in Resolution No. 2024-175.
CONSEQUENCE OF NEGATIVE ACTION:
PG&E will be unable to close the road for planned activities.
C: Larry Gossett Engineering Services, Bob Hendry, Engineering Services, Marke Smith, Engineering Services, California Highway Patrol, Sheriff Patrol Division Commander
THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
and for Special Districts, Agencies and Authorities Governed by the Board
body
IN THE MATTER OF: Ratifying the prior decision of the Public Works Director, or designee, to fully close a portion of Rollingwood Drive, from Greenwood Drive and Fordham Street, Greenwood Drive, from Bancroft Lane and Clarendon Court, all of Greenwood Drive, from Rollingwood Drive and Bowhill Lane, Clarendon Court, and Carlton Court, on July 29, 2024, through September 1, 2024, from 7:00 a.m. through 5:00 p.m., for the purpose of installing and replacing gas services, San Pablo area. (District I)
RC24-23
NOW, THEREFORE, BE IT RESOLVED that permission is granted to Pacific Gas & Electric Company to fully close Rollingwood Drive, Greenwood Drive, Bowhill Lane, Carlton Court, Clarendon Court, except for emergency traffic, local residents, US Postal Service and garbage trucks, on July 29, 2024, through September 1, 2024, for the period of 7:00 a.m. through 5:00 p.m., subject to the following conditions:
1. Traffic will be detoured via roads identified in a traffic control plan, reviewed by the Public Works Department. Emergency vehicles, residents within the construction area and essential services will be allowed access as required.
2. All signing to be in accordance with the California Manual on Uniform Traffic Control Devices.
3. Pacific Gas & Electric Company shall comply with the requirements of the Ordinance Code of Contra Costa County.
4. Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance.
5. Obtain approval for the closure from the Sheriff’s Department, the California Highway Patrol and the Fire District.