Title: ADOPT Resolution No. 2024-116 approving and authorizing the Public Works Director, or designee, to fully close a portion of Cambridge Avenue, between Wellesley Avenue and Beloit Avenue, on April 11, 2024, from 7:30 a.m. through 5:00 p.m., for the purpose of utility pole replacement and overhead utility equipment servicing, Kensington area. (No fiscal impact)

To:                                           Board of Supervisors

From:                                          Warren Lai, Public Works Director/Chief Engineer

Report Title:                     Approving and Authorizing to fully close a portion of Cambridge Avenue, on April 11, 2024, from 7:30 a.m. through 5:00 p.m., Kensington area.

Recommendation of the County Administrator Recommendation of Board Committee

 

RECOMMENDATIONS:

ADOPT Resolution approving and authorizing the Public Works Director, or designee, to fully close a portion of Cambridge Avenue, between Wellesley Avenue and Beloit Avenue, on April 11, 2024, from 7:30 a.m. through 5:00 p.m., for the purpose of utility pole replacement and overhead utility equipment servicing, Kensington area. (District I)

 

FISCAL IMPACT:

No fiscal impact.

 

BACKGROUND:

Pacific Gas and Electric Company shall follow guidelines set forth by the Public Works Department. Pacific Gas and Electric Company is requesting a road closure to replace a utility pole. The construction team indicated that a road closure is necessary for the requested work to be done safely due to the narrow road.

 

CONSEQUENCE OF NEGATIVE ACTION:

Pacific Gas and Electric will be unable to close the road for planned activities.

 

c: Larry Gossett-Engineering Services, Kellen O’Connor-Engineering Services, Bob Hendry, Engineering Services, Marke Smith, Engineering Services, Devon Petal, Engineering Services, Chris Lau, Maintenance, Kensington Police Department & Fire Protection District

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
and for Special Districts, Agencies and Authorities Governed by the Board

 

body

IN THE MATTER OF: Approving and authorizing the Public Works Director, or designee, to fully close a portion of Cambridge Avenue, between Wellesley Avenue and Beloit Avenue, on April 11, 2024, from 7:30 a.m. through 5:00 p.m., for the purpose of utility pole replacement and overhead utility equipment servicing, Kensington area. (District I)

 

 

 

                                                                                                                              RC24-16

 

 

 

NOW, THEREFORE, BE IT RESOLVED that permission is granted to Pacific Gas and Electric Company to fully close Cambridge Avenue, between Wellesley Avenue and Beloit Avenue, except for emergency traffic, local residents, US Postal Service and garbage trucks, on Thursday, April 11, 2024, for the period of 7:30 a.m. through 5:00 p.m., subject to the following conditions:

1.                     Traffic will be detoured via roads identified in a traffic control plan, reviewed by the Public Works Department. Emergency vehicles, residents within the construction area and essential services will be allowed access as required.

2.                     All signing to be in accordance with the California Manual on Uniform Traffic Control Devices.

3.                     Pacific Gas and Electric shall comply with the requirements of the Ordinance Code of Contra Costa County.

4.                     Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance.

5.                     Obtain approval for the closure from the Kensington Police Department and Fire Protection District.