File #: RES 2024-175    Version: 1 Name:
Type: Consent Resolution Status: Passed
File created: 4/15/2024 In control: BOARD OF SUPERVISORS
On agenda: 5/14/2024 Final action: 5/14/2024
Title: ADOPT Resolution No. 2024-175 approving and authorizing the Public Works Director, or designee, to fully close a portion of Rollingwood Drive, between Greenwood Drive and Fordham Street, Greenwood Drive, between Bancroft Lane and Clarendon Court, all of Greenwood Drive between Rollingwood Drive and Bowhill Lane, Clarendon Court, and Carlton Court, on May 15, 2024, through June 28, 2024, from 7:00 a.m. through 5:00 p.m., for the purpose of installing and replacing gas services, San Pablo area. (No fiscal impact)

To:                                           Board of Supervisors

From:                                          Warren Lai, Public Works Director/Chief Engineer

Report Title:                     Approving & Authorizing to fully close a portion of Rollingwood Drive, on May 15, 2024 through June 28, 2024, from 7:00 a.m. through 5:00 p.m., San Pablo area

Recommendation of the County Administrator Recommendation of Board Committee

 

RECOMMENDATIONS:

ADOPT Resolution approving and authorizing the Public Works Director, or designee, to fully close a portion of Rollingwood Drive, between Greenwood Drive and Fordham Street, Greenwood Drive, between Bancroft Lane and Clarendon Court, all of Greenwood Drive between Rollingwood Drive and Bowhill Lane, Clarendon Court, and Carlton Court, on May 15, 2024, through June 28, 2024, from 7:00 a.m. through 5:00 p.m., for the purpose of installing and replacing gas services, San Pablo area.  (District I)

 

FISCAL IMPACT:

No fiscal impact.

 

BACKGROUND:

Pacific Gas and Electric Company shall follow guidelines set forth by the Public Works Department. The Pacific Gas and Electric Company is requesting a road closure to facilitate the installation of new gas mains. Additionally, Pacific Gas and Electric Company will be conducting multiple service transfers and replacements.

 

CONSEQUENCE OF NEGATIVE ACTION:

Pacific Gas and Electric Company will be unable to close the road for planned activities.

 

c: Larry Gossett-Engineering Services, Kellen O’Connor-Engineering Services, Bob Hendry, Engineering Services, Devon Patel, Engineering Services, Chris Lau, Maintenance, CHP, Sheriff- Patrol Division Commander

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
and for Special Districts, Agencies and Authorities Governed by the Board

 

body

IN THE MATTER OF: Approving and authorizing the Public Works Director, or designee, to fully close a portion of Rollingwood Drive, between Greenwood Drive and Fordham Street, Greenwood Drive, between Bancroft Lane and Clarendon Court, all of Greenwood Drive between Rollingwood Drive and Bowhill Lane, Clarendon Court, and Carlton Court, on May 15, 2024, through June 28, 2024, from 7:00 a.m. through 5:00 p.m., for the purpose of installing and replacing gas services, San Pablo area.  (District I)

 

                                                                                                                    RC24-23

 

 

NOW, THEREFORE, BE IT RESOLVED that permission is granted to Pacific Gas and Electric Company to fully close Rollingwood Drive, Greenwood Drive, Bowhill Lane, Carlton Court, Clarendon Court, except for emergency traffic, local residents, US Postal Service and garbage trucks, on May 15, 2024, through June 28, 2024, for the period of 7:00 a.m. through 5:00 p.m., subject to the following conditions:

1.                     Traffic will be detoured via roads identified in a traffic control plan, reviewed by the Public Works Department. Emergency vehicles, residents within the construction area and essential services will be allowed access as required.

 

2.                     All signing to be in accordance with the California Manual on Uniform Traffic Control Devices.

 

3.                     Pacific Gas & Electric Company shall comply with the requirements of the Ordinance Code of Contra Costa County.

 

4.                     Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance.

 

5.                     Obtain approval for the closure from the Sheriff’s Department, the California Highway Patrol and the Fire District.