Title: ADOPT Resolution No. 23-549 ratifying the prior decision of the Public Works Director, or designee, to fully close a portion of Blackwood Drive between Murwood Drive and Solveig Drive, and all of Murwood Drive, Solveig Drive, Carrol Road, and Ward Drive, on August 14, 2023 through January 15, 2024 from 7:00 a.m. through 5:30 p.m., for an infrastructure renewal project, Walnut Creek area. (No fiscal Impact)

To:                                          Board of Supervisors

From:                                          Brian M. Balbas, Public Works Director

Report Title:                     Ratify the prior decision of the Public Works Director, or designee, to fully close a portion of Blackwood Drive, on August 14, 2023 through January 15, 2024, Walnut Creek area.

 

RECOMMENDATIONS:

ADOPT Resolution ratifying the prior decision of the Public Works Director, or designee, to fully close a portion of Blackwood Drive between Murwood Drive and Solveig Drive, and all of Murwood Drive, Solveig Drive, Carrol Road and Ward Drive, on August 14, 2023 through January 15, 2024 from 7:00 a.m. through 5:30 p.m., for the purpose of trenching to install approximately 6,200 feet of water main and required appurtenances for the infrastructure renewal project, Walnut Creek area. (District IV)

 

FISCAL IMPACT:

No fiscal impact.

 

BACKGROUND:

East Bay Municipal Utility District (EBMUD), the applicant, has requested the road closures to help facilitate the construction project. The narrow road widths are not conducive to maintaining one 10’ wide lane of traffic through the construction zones at all times during construction. Therefore, in the interest of expediting construction and maximizing traffic safety, EBMUD is requesting a road closure. EBMUD has requested this modification of the closure dates from the previously approved road closure permit due to the fact their crews are working ahead of schedule and will be available at an earlier date for this project. Applicant shall follow guidelines set forth by the Public Works Department.

 

 

CONSEQUENCE OF NEGATIVE ACTION:

Applicant will not have Board approval for completed road closure.

 

I hereby certify that this is a true and correct copy of an action taken and entered on the minutes of the Board of Supervisors on the date shown.

ATTESTED:

 

 

Monica Nino, County Administrator and Clerk of the Board of Supervisors

 

 

By:

 

THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
and for Special Districts, Agencies and Authorities Governed by the Board

body

IN THE MATTER OF: Ratifying the prior decision of the Public Works Director, or designee, to fully close a portion of Blackwood Drive between Murwood Drive and Solveig Drive, and all of  Murwood Drive , Solveig Drive , Carrol Road and Ward Drive, on August 14, 2023 through January 15, 2024 from 7:00 a.m. through 5:30 p.m., for the purpose of trenching for an infrastructure renewal project, Walnut Creek area. (District IV)

 

RC23-22

 

NOW, THEREFORE, BE IT RESOLVED that permission is granted to East Bay Municipal Utility District  to fully close a portion of  Blackwood Drive between Murwood Drive and Solveig Drive, and all of Murwood Drive , Solveig Drive , Carrol Road  and Ward Drive, except for emergency traffic, local residents, US Postal Service and garbage trucks on August 14, 2023 through January 15, 2024 for the period of 7:00 a.m. through 5:30 p.m., subject to the following conditions:

 

1.                     Traffic will be detoured via roads identified in a traffic control plan, reviewed by the Public Works Department. Emergency vehicles, residents within the event area and essential services will be allowed access as required.

 

2.                     All signing to be in accordance with the California Manual on Uniform Traffic Control Devices.

 

3.                     East Bay Municipal Utility District shall comply with the requirements of the Ordinance Code of Contra Costa County.

 

4.                     Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance.

 

5.                     Obtain approval for the closure from the Sheriff’s Department, the California Highway Patrol and the Fire District.