File #: 25-4597    Version: 1 Name:
Type: Consent Item Status: Agenda Ready
File created: 10/20/2025 In control: BOARD OF SUPERVISORS
On agenda: 11/4/2025 Final action:
Title: AUTHORIZE the Public Works Director, or designee, to award contract to Vantis for the Antioch Library Electrical System Upgrades Project located at 501 W. 18th Street, Antioch. (68% Measure X Funds, 21% California State Library Building Forward Grant, and 11% Library Funds).
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
No records to display.

To:                                          Board of Supervisors

From:                                          Warren Lai, Public Works Director/Chief Engineer

Report Title:                     Award contract to Vantis for the Antioch Library Electrical System Upgrades Project

Recommendation of the County Administrator Recommendation of Board Committee

 

RECOMMENDATIONS:

(1)                     APPROVE the design and bid documents, including the plans and specifications, for the above project.

 

(2)                     DETERMINE that the bid submitted by One Workplace Construction, LLC, dba Vantis (Vantis) complies with all requirements of the Project specifications, including the requirements of the County’s Outreach Program.

 

(3)                     DIRECT that Vantis shall submit two good and sufficient security bonds (performance and payment bonds) in the amount of $870,000 each.

 

(4)                     WAIVE any minor irregularities in Vantis’ bid.

 

(5)                     FURTHER DETERMINE that Vantis has submitted the lowest responsive and responsible bid for the project.

 

(6)                     DIRECT that, as a condition of contract award, Vantis and its subcontractors shall execute a Project Labor Agreement for the Project, as required by the Project Specifications.

 

(7)                     AWARD the construction contract for the above Project to Vantis in the listed amount ($870,000) submitted in the bid, and DIRECT the Public Works Director, or designee, to prepare the contract.

 

(8)                     ORDER that, after Vantis has signed the contract and returned it, together with the bonds, evidence of insurance, and other required documents, and the Public Works Director has reviewed and found them to be sufficient, the Public Works Director, or designee, is authorized to sign the contract for this Board.

 

(9)                     ORDER that, in accordance with the Project specifications and upon signature of the contract by the Public Works Director, or designee, any bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for bid security shall be returned.

 

(10)                     AUTHORIZE the Public Works Director, or designee, to sign any escrow arrangements prepared for this Project to permit the direct payment of retention into escrow for the substitution of securities for monies withheld by the County to ensure performance under the contract, pursuant to Public Contract Code Section 2230.

 

(11)                     AUTHORIZE the Public Works Director, or designee, to order changes or additions to the work pursuant to the Public Contract Code Section 20142. The extra cost to the County for any change or addition to the work so ordered shall not exceed $56,000.

 

(12)                     DELEGATE pursuant to the Public Contract Code Section 4114, to the Public Works Director, or designee, the Board’s functions under Public Contract Code Section 4107 and 4110.

 

(13)                     DECLARE that, should the award of the contract to Vantis be invalidated for any reason, the Board would not in any event have awarded the contract to any other bidder, but instead would have exercised its discretion to reject bids received. Nothing in this Board Order shall prevent the Board from re-awarding the contract to another bidder in cases where the successful bidder establishes a mistake, refuses to sign the contract, or fails to furnish the required bonds or insurance (See Public Contract Code Sections 5100-5107).

 

FISCAL IMPACT:

$591,600 (68%) be funded through Measure X Funds, $182,700 (21%) will be funded through the California State Library Building Forward Grant (SB 129), and $95,700 (11%) will be funded through Library Funds.

 

BACKGROUND:

This project will upgrade the electrical system, upgrade interior lighting and provide accessibility improvements at the Antioch Library located at 501 W. 18th Street, Antioch.

 

The facility is an 11,225 square foot building constructed in 1967 with what is now an antiquated electrical system. The upgrades include installing a new higher capacity electrical switchboard and additional service outlets on the main library floor to serve library patrons’ needs for powering their personal electronics. Interior lighting upgrades include replacing fluorescent fixtures with more energy-efficient light emitting diode (LED) fixtures to be in line with the County’s Climate Action Plan. The project also includes accessibility upgrades as triggered and required by the 2022 California Building Code.

On March 11, 2025, the Board of Supervisors approved the design and bid documents for the construction of the Project and authorized the solicitation of bids in accordance with Public Contract Code Section 22037.  Bids were received and opened by the Public Works Department on June 5, 2025.

 

On July 22, 2025, This Board approved the rejection of the submitted bids due to unresponsive GFE packages and approved the re-advertisement of this project. Bids were received on September 10, ,2025 and the bid results are as follows:

 

Bidder

Bid Amount

One Workplace Construction LLC d/b/a/ Vanti, Inc.

$870,000

CB2 Builders, Inc.

$1,036,340,69

 

The Public Works Department staff has thoroughly reviewed the bids and determined that Vantis's bid is responsive and that Vantis has documented an adequate good faith effort to comply with the requirements of the County's Outreach Program, as provided in the Project specifications. Staff recommends that the construction contract for this Project be awarded to Vantis, the lowest, responsible bidder, in the amount of $870,000, as listed in Vantis's bid.

 

CONSEQUENCE OF NEGATIVE ACTION:

Without the Board of Supervisors approval, the project will not be constructed, the electrical system will remain out of date and insufficient for modern power requirements in libraries, the lighting will not be energy efficient and aligned with the County's Climate Action Plan, and the parking lot will not meet accessibility standards.