Legislation Details

File #: 24-0655    Version: 1 Name:
Type: Consent Item Status: Passed
File created: 2/20/2024 In control: BOARD OF SUPERVISORS
On agenda: 3/5/2024 Final action: 3/5/2024
Title: APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a contract amendment with WSP USA Environment & Infrastructure, Inc., to extend the term through March 31, 2025, for on-call stormwater consulting and technical services, with no change to the payment limit, Countywide. (No fiscal impact)

To:                                          Board of Supervisors

From:                                          Warren Lai, Public Works Director/Chief Engineer

Report Title:                     On-call Contract Amendment with WSP USA Environment & Infrastructure, Inc., Countywide.

Recommendation of the County Administrator Recommendation of Board Committee

 

RECOMMENDATIONS:

APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a contract amendment with WSP USA Environment & Infrastructure, Inc., to extend the term through March 31, 2025, for on-call stormwater consulting and technical services, with no change to the payment limit, Countywide.

 

FISCAL IMPACT:

There is no fiscal impact with this action, as it is only to extend the term of the contract. This project, including the contract, is funded by 100% Stormwater Utility Area Assessment Funds. (Project No. 7517-6W7089)

 

BACKGROUND:

The County Watershed Program (CWP) is responsible for implementing measures to reduce trash/litter and other pollutants of concern found in local waterways in unincorporated Contra Costa County. As such, CWP requires routine and on-call assistance with coordination and support for implementing the Contra Costa County Green Infrastructure Plan and for control measures and activities in order to comply with the Municipal Regional Stormwater NPDES (National Pollutant Discharge Elimination System) Permit (MRP) from the California Regional Water Quality Control Board, San Francisco Bay Region (Water Board).

 

CONSEQUENCE OF NEGATIVE ACTION:

Without the approval of this contract by the Board of Supervisors, Contra Costa County will be out of compliance with the MRP from the Water Board.

 

 

 

 

 

 

cc:                     Allison Knapp, Deputy Public Works Director, allison.knapp@pw.cccounty.us

                     Tim Jensen, Flood Control, tim.jensen@pw.cccounty.us

                     Michele Mancuso, Flood Control, County Watershed Program, Michele.Mancuso@pw.cccounty.us

                     Jennifer Joel, County Watershed Program, Jennifer.Joel@pw.cccounty.us

                     Rachelle Untal, Flood Control, Rachelle.Untal@pw.cccounty.us

                     Catherine Windham, Flood Control, catherine.windham@pw.cccounty.us