Title: ADOPT Resolution No. 2026-13 approving and authorizing the Public Works Director, or designee, to fully close a portion of Edgecroft Road, between 800 Coventry Road and 61 Edgecroft Road, on January 26, 2026, from 8:30 a.m. through 4:00 p.m., for the purpose of performing overhead utility work, Kensington area. (No fiscal impact)
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
No records to display.

To:                                           Board of Supervisors

From:                                          Warren Lai, Public Works Director/Chief Engineer

Report Title:                     Approve and Authorize to fully close a portion of Edgecroft Road on January 26, 2026, from 8:30 a.m. through 4:00 p.m., for the purpose of overhead utility work, Kensington area.

Recommendation of the County Administrator Recommendation of Board Committee

 

RECOMMENDATIONS:

ADOPT Resolution approving and authorizing the Public Works Director, or designee, to fully close a portion of Edgecroft Road, between 800 Coventry Road and 61 Edgecroft Road, on January 26, 2026, from 8:30 a.m. through 4:00 p.m., for the purpose of performing overhead utility work, Kensington area. (District I)

 

FISCAL IMPACT:

No fiscal impact.

 

BACKGROUND:

Due to the narrow road width of Edgecroft Road at the work site, Pacific Gas & Electric Company (PG&E) has requested the road closure to perform overhead work on an existing utility pole. There is insufficient road width to setup and operate boom trucks and safely maintain through traffic. Applicant shall follow guidelines set forth by the Public Works Department.

 

CONSEQUENCE OF NEGATIVE ACTION:

Applicant will be unable to close the road to complete planned overhead utility work.

 

 

c: Jocelyn LaRocque-Engineering Services, Marke Smith-Engineering Services, Devon Patel-Engineering Services, Bob Hendry-Engineering Services, Michelle Cordis-Maintenance, Kensington Police Department, and Kensington Fire Protection District

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
and for Special Districts, Agencies and Authorities Governed by the Board

 

body

IN THE MATTER OF: Approving and Authorizing the Public Works Director, or designee, to fully close a portion of Edgecroft Road, between 800 Coventry Road and 61 Edgecroft Road, on January 26, 2026, from 8:30 a.m. through 4:00 p.m., for the purpose of performing overhead utility work, Kensington area. (District I)

 

 

                                                                                                         RC25-51

 

 

NOW, THEREFORE, BE IT RESOLVED that permission is granted to Pacific Gas & Electric Company to fully close Edgecroft Road, between 800 Coventry Road and 61 Edgecroft Road, except for emergency traffic, local residents, US Postal Service and garbage trucks, on January 26, 2026, from 8:30 a.m. through 4:00 p.m., subject to the following conditions:

 

1. Traffic will be detoured via roads identified in a traffic control plan, reviewed by the Public Works Department. Emergency vehicles, residents within the construction area and essential services will be allowed access as required.

 

2. All signing to be in accordance with the California Manual on Uniform Traffic Control Devices.

 

3. Pacific Gas & Electric Company shall comply with the requirements of the Ordinance Code of Contra Costa County.

 

4. Provide the County with a Certificate of Insurance in the amount of $1,000,000.00 for Comprehensive General Public Liability which names the County as an additional insured prior to permit issuance.

 

5. Obtain approval for the closure from the Kensington Police Department, and the Kensington Fire Protection District.

 

 

 