Legislation Details

File #: 26-4133    Version: 1 Name:
Type: Discussion Item Status: Agenda Ready
File created: 9/22/2026 In control: Transportation, Water & Infrastructure Committee
On agenda: 9/28/2026 Final action:
Title: RECEIVE staff report and RECOMMEND that the Board of Supervisors approve the submission of grant applications to the Highway Safety Improvement Program for Cycle 13.
Attachments: 1. 5a. Highway Safety Improvement Program - Cycle 13
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
No records to display.

TRANSPORTATION, WATER & INFRASTRUCTURE COMMITTEE

Meeting Date:    September 28, 2026

Subject:    RECEIVE staff report and RECOMMEND that the Board of Supervisors approve the submission of grant applications to the Highway Safety Improvement Program for Cycle 13

Submitted For:    Warren Lai || Director | PUBLIC WORKS DEPARTMENT

Department:    PUBLIC WORKS DEPARTMENT

Referral No:    2

Referral Name:    Review applications for transportation, water, and infrastructure grants to be prepared by the Public Works and Conservation and Development Departments

Presenter:    Jeff Valeros || Senior Civil Engineer | PUBLIC WORKS DEPARTMENT

Contact:    Jeff Valeros | (925) 313-2031

 

 

Referral History:

The County often seeks regional, state, and federal funding to augment local road funding, stretching local dollars to build improvements that would not be possible otherwise. The current opportunity is through the Highway Safety Improvement Program (HSIP). This grant program is currently on its thirteenth cycle. Public Works has previously submitted HSIP grant applications, several of which were awarded.

 

Referral Update:

On July 1, 2026, Caltrans announced the Call for Projects for Cycle 13 of the Highway Safety Improvement Program (HSIP). This potential award of state funding will augment local road funds, stretching local dollars to build improvements that would not be possible otherwise. HSIP is a core federal-aid program to the states for the purpose of achieving a significant reduction in fatalities and serious injuries on all public roads. HSIP focuses on infrastructure projects with nationally recognized crash reduction factors (CRFs) and must be identified on the basis of collision history. Senate Bill 137 allows the exchange of state funds with federal funds, and it is expected that $230 million of federal funds and $140 million of State funds will be used projects selected for funding in HSIP Cycle 13.

 

Examples of eligible type of projects may include, but are not limited to, the following list:

 

                     Intersection safety improvements

                     Pavement and shoulder widening

                     Installation of rumble strips or other warning devices

                     Installation of a skid-resistant surface

                     Improvement for bicycle or pedestrian safety

                     Elimination of hazards at a railway-highway crossing

                     Traffic calming feature

                     Elimination of a roadside obstacle

                     Highway signage and pavement markings

                     Traffic control or other warning device

                     Installation of guardrails, barriers, and crash attenuators

 

There are two application categories in HSIP Cycle 13: Benefit Cost Ratio (BCR) and Funding Set-Asides (SA). Three-hundred six million ($306,000,000) will be for BCR applications and sixty-four million ($64,000,000) for five Funding Set-asides (guardrail upgrades, pedestrian crossing enhancements, lane departure prevention, bike safety improvements, and tribes). A BCR calculation is not required for applications pursuing Funding SAs.

 

The federal cost share of HSIP funding for the projects described below is 90% with a local match pf 10%. Typically, local match funds are derived from Road Fund revenues.

 

If authorized to proceed, staff will finalize and submit grant applications for the recommended candidate projects by November 2, 2026. Announcements of the statewide awards are expected in January 2027.

 

Recommended Candidate Projects:

 

The Public Works Department recommends the following projects as candidates for Cycle 13 of HSIP funding (in no particular order), based upon collision history, appropriateness for a Funding SA and initial project scoping:

 

1.                     Countywide Guardrail Upgrades Phase 4 (SA) - Brentwood, Byron, and Discovery Bay (District 3)

 

This project proposes to upgrade existing guardrails in the unincorporated areas of Brentwood, Byron, and Discovery Bay. This project is a continuation of systemically upgrading all guardrails in the unincorporated County.

 

2.                     Camino Diablo Safety Improvements (BCR) - Byron (District 3)

 

This project proposes to install street lighting and edge-line rumble strips along Camino Diablo between Vasco Road and McCabe Drive.

 

During project research and prior to the application deadline, if staff discovers a critical constraint that would result in the project being cost prohibitive or will not meet the eligibility requirements of the grant funding program, staff will hold the application for further study to increase project readiness for the following grant cycle.

 

Recommendation(s)/Next Step(s):

RECEIVE staff report and RECOMMEND that the Board of Supervisors approve the submission of grant applications to the Highway Safety Improvement Program (HSIP) for Cycle 13.

 

 

Fiscal Impact (if any):

90% Highway Safety Improvement Program Funds, 10% Local Funds.