To: Board of Supervisors
From: Warren Lai, Public Works Director/Chief Engineer
Report Title: APPROVE the North Bailey Road Active Transportation Corridor Project and take related actions under CEQA
?Recommendation of the County Administrator ? Recommendation of Board Committee
RECOMMENDATIONS:
APPROVE the North Bailey Road Active Transportation Corridor Project (Project), and AUTHORIZE the Public Works Director, or designee, to advertise the Project, Bay Point area. (County Project No.: WO4054, DCD-CP#22-05) (District V)
DETERMINE the Project is a California Environmental Quality Act (CEQA) Categorical Exemption, pursuant to Article 19, Section 15301 Class 1(c) and Section 15304 Class 4(h) of the CEQA Guidelines, and
DIRECT the Director of Conservation and Development (DCD), or designee, to file a Notice of Exemption (NOE) with the County Clerk, and
AUTHORIZE the Public Works Director, or designee, to arrange for payment of a $25 fee to DCD processing, and a $50 fee to the County Clerk for filing the NOE.
FISCAL IMPACT:
Estimated Project cost: $10,724,000. (57% Active Transportation Program Funds, 20% Local Road Funds, 9% Navy Mitigation Funds, 9% Safe Routes to Bart Program Funds, 5% Bay Point Area of Benefit Funds)
BACKGROUND:
The project involves construction of a 10-foot-wide two-way buffered Class IV separated bike path on the west side of Bailey Road for enhanced pedestrian and bicyclist safety. Improvements include narrowing the travel lane widths, reconstruction of the existing landscape median, roadway, curb, gutter, and sidewalk, relocation of existing streetlights, and roadway treatment. Additionally, the project includes the installation of a new traffic signal at the intersection of Bailey Road with Mary Anne Lane/Placer Drive, modification of existing traffic signals to include separated bike path prioritization, Americans with Disabilities Act (ADA)-compliant curb ramps, ADA-accessible sidewalks, driveway and crosswalk enhancements, and roadw...
Click here for full text