Legislation Details

File #: 26-4736    Version: 1 Name:
Type: Consent Item Status: Agenda Ready
File created: 10/16/2026 In control: BOARD OF SUPERVISORS
On agenda: 11/3/2026 Final action:
Title: APPROVE and AUTHORIZE the Chair, Board of Supervisors, to execute a quitclaim deed to East Bay Regional Park District for portions of Assessor’s Parcel Numbers 080-080-002 & -004 in conjunction with the Morgan Territory Road Bridges (MP 5.0 & 5.2) Replacement Project, and APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a right-of-way contract with East Bay Regional Park District to acquire drainage easements, roadway easements, and temporary construction easements in connection with the Project, Clayton area. (100% Local Road Funds)
Attachments: 1. Final Acquisition Package, 2. NOE Morgan Territory Rd Bridges
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
No records to display.
To: Board of Supervisors
From: Warren Lai, Public Works Director/Chief Engineer
Report Title: Quitclaim County rights and execute a Right of Way Contract with East Bay Regional Parks District in conjunction with the Morgan Territory Road Bridges (MP 5.0 & 5.2) Replacement Project, Clayton area
Recommendation: Recommendation of the County Administrator
/

RECOMMENDATIONS:
As the governing body of Contra Costa County, Contra Costa County Public Works requests the Board to:

1. APPROVE and AUTHORIZE the Chair, Board of Supervisors, to execute a quitclaim deed to East Bay Regional Park District (District) for portions of Assessor’s Parcel Numbers (APN) 080-080-002 & -004 totaling approximately 8,845 sf of land in conjunction with the Morgan Territory Road Bridges (MP 5.0 & 5.2) Replacement Project (Project) pursuant to Government Code Section 25526.5.

2. APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a right-of-way contract with East Bay Regional Park District, to acquire drainage easements totaling 2,062 sf, roadway easements totaling 9,462 sf and approximately 4,984 sf in temporary construction easements all over and across APNs 080-080-002 in connection with the Project.

3. DIRECT the Real Estate Division of the Public Works Department to cause said Quitclaim Deed and a certified copy of this Board Order to be delivered to the grantee for recording in the Office of the County Clerk-Recorder.

FISCAL IMPACT:
100% Local Road Funds.

BACKGROUND:
The purpose of this project is to replace two existing bridges on Morgan Territory Road over Marsh Creek located at postmiles 5.0 and 5.2. Prior to demolishing the existing bridges, temporary detour roads and water diversion systems will be constructed at both bridge replacement locations. The detour roads will divert traffic around the closed roads during construction. Following construction of each bridge, the detour roads and water diversion systems will be removed. Both replacement bridges wil...

Click here for full text