To: The Contra Costa County Flood Control and Water Conservation District Board of Supervisors
From: Warren Lai, Public Works Director/Chief Engineer
Report Title: Contract Amendment with Schaaf & Wheeler, Consulting Civil Engineers, for Professional Engineering Services Relating to Hydrology, Hydraulic, and Hydrologic Data Collection.
Recommendation: Recommendation of the County Administrator
/
RECOMMENDATIONS:
Acting as the governing body of the Contra Costa County (County) Flood Control and Water Conservation District (FCD), APPROVE and AUTHORIZE the Chief Engineer, or designee, to execute a contract amendment with Schaaf & Wheeler, Consulting Civil Engineers, to extend the term through November 29, 2028, for on-call consulting services for professional engineering services relating to hydrology, hydraulic, and hydrologic data collection, with no change to the payment limit, Countywide.
FISCAL IMPACT:
There is no fiscal impact with this action.
BACKGROUND:
The FCD provides regional flood protection, technical information, hydrology data and education to cities and residents, as well as environmental stewardship for over 70 miles of streams and several detention basins as part of the County’s flood protection system. The FCD prepares and reviews modification designs of the County’s flood control systems. In many cases, the flood protection facility proposed for modification was constructed by the U.S. Army Corps of Engineers or the U.S. Department of Agriculture Natural Resources Conservation Service, and therefore must adhere to their standards, policies, and procedures.
In implementing modifications to the flood control system, the FCD requires temporary specialized professional engineering services. Through this on-call agreement, the Consultant was contracted to provide hydrology, hydraulics, and hydrologic data collection services in support of FCD and outside agency projects throughout the County.
The solicitation for on-call consulting services for...
Click here for full text