To: Board of Supervisors
From: Warren Lai, Public Works Director/Chief Engineer
Report Title: Consulting Services Agreement with Consor PMCM, Inc., East Richmond and Kensington areas.
?Recommendation of the County Administrator ? Recommendation of Board Committee
RECOMMENDATIONS:
APPROVE and AUTHORIZE the Public Works Director, or designee, to execute a Consulting Services Agreement (contract) with Consor PMCM, Inc., in an amount not to exceed $477,162.49 for construction management services for the 2025 East Richmond Heights Fiberized Slurry Seal and 2025 Kensington Fiberized Slurry Seal and Overlays Projects for the period September 9, 2025 through December 31, 2026, East Richmond and Kensington areas. (County Project No.: 0672-6U2119, 0672-6U2121) (District I)
FISCAL IMPACT:
Work performed under this contract will be funded by 100% Local Road Funds.
BACKGROUND:
The 2025 East Richmond Heights Fiberized Slurry Seal project consists of placing a type II fiberized slurry seal on various roads in the unincorporated area of East Richmond Heights. Work will involve surface preparation, including; weed spray, crack sealing, pavement failure repair, edge grinding, removing existing thermoplastic stripes and pavement markings, adjusting and setting survey monuments, placement of thermoplastic striping and pavement markings.
The 2025 Kensington Fiberized Slurry Seal and Overlays project consists of placing two types of surface treatments on various roads in the Kensington area and Clark Road in El Sobrante: a type II fiberized slurry seal, and cold plane and overlay with hot mix asphalt (HMA). Work will involve surface preparation, including weed spray, crack sealing, pavement failure repair, edge grinding, removal of existing thermoplastic stripes and pavement markings, removal of existing curb and sidewalk, and placing concrete curb ramps in compliance with the American with Disabilities Act, adjusting and setting survey monuments, and placement of thermoplasti...