Legislation Details

File #: RES 2026-283    Version: 1 Name:
Type: Consent Resolution Status: Agenda Ready
File created: 5/20/2026 In control: BOARD OF SUPERVISORS
On agenda: 7/14/2026 Final action:
Title: ADOPT Resolution No. 2026-283 approving and authorizing the Public Works Director, or designee, to fully close all of Third Avenue, between Lillian Street and Flora Street, and a portion of Third Avenue, between Ceres Street and Pomona Street, on August 12, 2026, through August 13, 2026, from 9:00 a.m. through 3:00 p.m., for the purpose of geotechnical soil sampling, Crockett area. (No fiscal impact)
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
No records to display.
To: Board of Supervisors
From: Warren Lai, Public Works Director/Chief Engineer
Report Title: Approve and Authorize to fully close portions of Third Avenue on August 12, 2026, through August 13, 2026, from 9:00 a.m. through 3:00 p.m., for the purpose of geotechnical soil sampling, Crockett area.
?Recommendation of the County Administrator ? Recommendation of Board Committee


RECOMMENDATIONS:
ADOPT Resolution approving and authorizing the Public Works Director, or designee, to fully close all of Third Avenue, between Lillian Street and Flora Street, and a portion of Third Avenue, between Ceres Street and Pomona Street, on August 12, 2026, through August 13, 2026, from 9:00 a.m. through 3:00 p.m., for the purpose of geotechnical soil sampling, Crockett area. (District V)

FISCAL IMPACT:
No fiscal impact.

BACKGROUND:
Due to the narrow road width of Third Avenue at the sampling locations, BSK Associates has requested the road closure to complete the soil borings. The roadway does not provide sufficient space to setup and operate drilling equipment while maintaining through traffic. This geotechnical work is being performed on behalf of the County for future road improvement projects at these locations. Applicant shall follow guidelines set forth by the Public Works Department. This request was previously approved by the Board of Supervisors on May 12, 2026, and in Resolution No. 2026-170. The applicant has submitted a new request due to a revision in construction scheduling.

CONSEQUENCE OF NEGATIVE ACTION:
Applicant will be unable to close the road to complete planned geotechnical soil sampling.


c: Alex Vazquez-Engineering Services, Marke Smith-Engineering Services, Michelle Cordis-Maintenance, CHP, Sheriff-Patrol Division. Commander














THE BOARD OF SUPERVISORS OF CONTRA COSTA COUNTY, CALIFORNIA
and for Special Districts, Agencies and Authorities Governed by the Board

body
IN THE MATTER OF: Approving and authorizing the Public Works Director, or ...

Click here for full text