File #: 25-1737    Version: 1 Name:
Type: Consent Item Status: Agenda Ready
File created: 4/29/2025 In control: BOARD OF SUPERVISORS
On agenda: 5/13/2025 Final action:
Title: AWARD and AUTHORIZE the Public Works Director, or designee, to execute a construction contract with Bay Cities Paving & Grading, Inc. in the amount of $2,530,459 for the 2025 Walnut Creek Overlays Project, Walnut Creek area. (100% Local Road Funds)
Attachments: 1. GFE Letter MCK Final
Date Ver.Action ByActionResultTallyAction DetailsMeeting DetailsVideo
No records to display.
To: Board of Supervisors
From: Warren Lai, Public Works Director/Chief Engineer
Report Title: Construction Contract for the 2025 Walnut Creek Overlays Project.
?Recommendation of the County Administrator ? Recommendation of Board Committee


RECOMMENDATIONS:

(1) APPROVE plans, specifications, and design for the 2025 Walnut Creek Overlays Project. (County Project No. 0672-6U2122) (District IV).
(2) DETERMINE that MCK Services, Inc. ("MCK"), the lowest monetary bidder, submitted a non-responsive bid by failing to comply with the requirements of the County's Outreach Program for this project, as provided in the project specifications; and REJECT the bid on that basis.
(3) DETERMINE that Bay Cities Paving & Grading, Inc. ("Bay Cities"), the second lowest monetary bidder, has complied with the requirements of the County's Outreach Program and has exceeded the Mandatory Subcontracting Minimum for this project, as provided in the project specifications; and FURTHER DETERMINE that Bay Cities has submitted the lowest responsive and responsible bid for the project.
(4) AWARD the construction contract for the above project to Bay Cities in the listed amount ($2,530,459.53) and the unit prices submitted in the bid, and DIRECT that Bay Cities shall present two good and sufficient surety bonds, as indicated below, and that the Public Works Director, or designee, shall prepare the contract.
(5) ORDER that, after the contractor has signed the contract and returned it, together with the bonds as noted below and any required certificates of insurance or other required documents, and the Public Works Director has reviewed and found them to be sufficient, the Public Works Director, or designee, is authorized to sign the contract for this Board.
(6) ORDER that, in accordance with the project specifications and/or upon signature of the contract by the Public Works Director, or designee, bid bonds posted by the bidders are to be exonerated and any checks or cash submitted for securi...

Click here for full text