APPROVE and AUTHORIZE, the Public Works Director, or designee
to execute a contract amendment with AssetWorks Inc., effective
December 23, 2021 to confirm and consent to AssetWorks Inc.
becoming the party to the contract, extend the term from March 31,
2023 through June 30, 2024, and increase the payment limit by
$230,000 to a new payment limit of $1,165,000, for the Vehicle
Telematics GPS reporting hardware, software, installation and
services, Countywide. (100% Fleet Internal Service Fund)
C.51.
APPROVE and AUTHORIZE the Public Works Director, or designee,
to execute a lease with Seecon Commercial, LLC for approximately
14,900 square feet of office space at 4071 Port Chicago Highway,
Suite 250, in Concord, for the period beginning February 1, 2023, and
ending January 31, 2028, for use by the Employment and Human
Services Workforce Development Board, at an initial annual rent of
$359,160 with annual increases thereafter. (44% State of California /
56% Workforce Innovation and Opportunity Act grant.)
C.52.
Attachments:
APPROVE and AUTHORIZE the Public Works Director, or designee,
to execute four individual contracts with the following contractors:
FCS International, Inc., Helix Environmental Planning, Inc., ICF Jones
& Stokes, Inc., and Nichols Consulting Engineers, CHTD., in an
amount not to exceed $700,000 each to provide on-call environmental
consulting services for various projects for the period of September 19,
2023 through September 18, 2026, Countywide. (100% Various
Funds)
C.53.
Acting as the governing body of the Contra Costa County Flood
Control and Water Conservation District, APPROVE and
AUTHORIZE the Chief Engineer, or designee, to execute four
individual contracts with the following contractors: CWE; GEI
Consultants, Inc., Kjeldsen, Sinnock & Neudeck, Inc., and Schaaf &
Wheeler, Consulting Civil Engineers, in an amount not to exceed
$1,000,000 each to provide on-call consulting services for professional
engineering services related to flood control facility design for the
period September 30, 2023 through September 29, 2026, Countywide.
(100% Flood Control District Funds)
C.54.
ADOPT Resolution No. 23-564 to fully close a portion of Mendocino
Drive, between Amador Ct. and Klamath St., on September 27, 2023,
from 8:00 a.m. through 4:00 p.m., for the purpose of using a crane to
place an accessory dwelling unit in a resident's rear yard, Bay Point
area. (No fiscal impact)
C.55.